text.skipToContent text.skipToNavigation

PM Elektro - Growth, Efficiency and Bright Light for "Panel Builder Plus"

Panel builder PM Elektro experienced significant growth, moved to larger premises and immediately optimised internal material logistics. Supplier itsme conducted a cost-benefit analysis for this purpose and implemented a 2BIN system; it has recently started managing the grab stock in PM Elektro's warehouse. For the lighting on the new shop floor, itsme also provided consultancy and installation services. "Wow, it’s so bright in here!" is what people say when they enter the workshop.

PM Elektro in Middelburg builds panels for controllers and energy distributors. "We work for a wide range of markets; from mechanical engineering and industry to the maritime sector," says co-owner Martijn Nieuwenhuize. "Whatever the purpose, we have expertise in relevant standards and specifications for every market. We are a brand-independent panel builder using only A-quality components. In 2017, I took over the company together with my business partner Peter But. Since then, we have grown from 8 to 23 fixed employees and a flexible team of 5 to 10 temporary employees. We design and engineer the panels and build them. We are not an installer, but if necessary we can do so because we want to be a panel builder plus." 

Curious about itsme's 2BIN system?

Fill in the form and we will get back to you!

On-site installation of backorders

itsme supplies most of the electrical components. Nieuwenhuize: "Our relationship is based on mutual trust and good communication. We can always call them, for example if we need help with the calculations for a large quotation. We can then send them the complete list of materials and, after one or two days, a price will be generated that we can include in our calculations. This is what makes itsme unique; no other supplier does this. That’s their added value." itsme account manager Arno Capelle explains: "They get a lot of requests from their customers in all kinds of formats, sometimes unadaptable and almost unreadable. We can still do something with that and have an application in our ERP system to convert large amounts of data into quotations."

"itsme informs us, which we appreciate"

Doing calculations is one thing, being able to deliver is another. "We always have components on backorder," explains Nieuwenhuize. "That's why we install panels that are almost ready at the customer's premises. In this way, they are cleared from our floor and connections can already be made. If the final circuit breaker or relay is delivered, one of our field service engineers will install it on site. These backorders trickle in via itsme. They can't do much about it and neither can we. All that matters is that we keep customers well informed. Every week, we make a round of calls to customers with outstanding backorders.  As long as you inform them, they understand. If the customer has to make follow-up calls themselves, unpleasant conversations arise. We are only able to do this because itsme informs us, which we appreciate. We regularly receive an overview of our orders, with outstanding positions and date of expected delivery, from itsme."


Heavier energy distributors

Due to the company’s growth, PM Elektro moved last year; the space on the shop floor tripled to 1,000 m2. A great opportunity to optimise internal logistics, starting with the grab stock, which accounts for 20% of the order volume at itsme. Nieuwenhuize: "In our old warehouse, we had no overview. Because we can no longer assume that our suppliers have everything in stock, we have to keep our own stock in order." This is why PM Elektro switched to a 2BIN system on the advice of itsme. Marga van Ligten, consultant at itsme Connected Business, explains: "We did a cost-benefit analysis beforehand.

A lot of material in the grab stock turned out to be ordered manually; there was definitely cost saving potential there. Together, we created an item database, which now contains 800 items; these items are placed in bins provided with a barcode label. We have recently started dropping in regularly to scan and replenish stock." PM Elektro orders the remaining 80% of materials on a project-by-project basis. A year ago, itsme started delivering in plastic exchange crates, partly to reduce the amount of packaging material. Capelle: "We are now in talks on how to get the items from goods receipt to the mechanic on-site as efficiently as possible." Nieuwenhuize: "Again, this is itsme’s added value. We spend all day optimising this company. So it's nice to have itsme as a sounding board. They come up with something, or we do, and then we sit down to perfect it."


"It's good to have a sounding board"

Now that PM Elektro has its premises and internal logistics in order, it is ready for additional growth. Ambitions abound, assures Nieuwenhuize. "We want to contribute to the energy transition with energy distributors. We once started with small energy distributors, but we have greatly expanded our capabilities. We carry several brands and have secured product licences to build larger and heavier energy distributors. Our licences now run up to 6,300 A, for brands such as ABB, Hager, Halyester, Schneider Electric and Siemens." Capelle: "itsme has extensive agreements with those brands on logistics and other issues. Another important development is that laws and regulations increasingly require users to do energy monitoring." Nieuwenhuize: "In recent years, energy distributors have indeed become more complex, partly because of this energy monitoring. As a result, they now have a significant amount of control. We know how to keep up with these technical developments and are on top of them."

Good lighting

Lighting was also important for the new workshop, Nieuwenhuize concludes. "Mechanics must have sufficient light during their work and they need to have a clear look inside the enclosure or cabinet, without being troubled by shadows. They also need to be able to read the drawings on paper clearly; so the light should not be too bright or the wrong colour.  We are no experts in this area, so we needed specialist advice. That automatically leads back to itsme.  They came over, checked it out, made measurements, created a lighting plan and made luminance calculations." It led to a proposal from itsme Lighting Technology for Luminaid LED luminaires giving 500 lux on the ground. That was implemented and the resulting lighting was received positively. "All people entering the workshop for the first time comment on it: "Wow, it’s so bright in here!". That's great. Together with itsme, we tackled the lighting right away; I am very happy with that."

 

Check out our other success stories:

  • TESTIMONIAL
    15 feb. 2024
    Enduro - Complete package for heavy-duty work
    Enduro Softslings builds machines for the manufacture of its own heavy lifting soft slings. For a new machine, it called in itsme for the full package: advice on the drives, supply of components and programming of the controls. “We completed the entire project in just over six months. That’s fast for such a specialised machine.”
    Read more
  • TESTIMONIAL
    19 sep. 2023
    Sparck - using air to remove air from boxes
    Drachten-based Sparck Technologies builds automated packaging machines that make customised boxes for online retailers. The company focuses on energy-intensive pneumatics at a number of points for its innovative, high-speed machines. This ensures maximum benefit for customers: less air in the box, less cardboard consumption, higher packaging capacity and less dependence on manpower. itsme supplies the Festo standard components for this and also ensures that Sparck-specific pneumatics products are made.
    Read more
  • TESTIMONIAL
    12 apr. 2023
    Solid relationship extended with air
    Welding company and machine builder Leenstra has had itsme as a regular partner for the supply of electrical engineering materials for more than twenty years. Thanks to a recent machine building project, the relationship broadened to mechanical products, in particular Festo pneumatics. This involved a machine for the manufacture of concrete elements. It only makes the cooperation between Leenstra and itsme more solid.
    Read more
  • TESTIMONIAL
    4 mei 2021
    When time pressure rules your schedule
    Design and delivery of industrial turnkey projects, automation of operating systems; Mario Claes, owner of Etec Systems in Balen \(Belgium\), has been drawing on a continuously growing source of experience since fourteen years now. Each situation reveals unique challenges. Each solution contributes to an ever expanding range of knowledge
    Read more

Stay up to date with the latest news:

  • NEWS
    12 dec. 2023
    Festo's Robust guided cylinder
    This impressive DFM cylinder from Festo offers the best price and performance in terms of optimal guidance, robustness and flexibility. At the same time, the cylinder is reliable and widely applicable - even at high loads. Thanks to its superior guidance, the DFM can be used for a wider range of applications than comparable alternatives on the market.
    Read more
  • NEWS
    17 okt. 2023
    Festo - Proportional pressure control valve VPPI
    With the VPPI proportional pressure control valve, all nominal sizes are controlled directly; without the need for pilot valves or pre-stages. Due to the pressure compensating element, the valve regulates dynamically and accurately; even at the larger nominal sizes. The powerful and low-friction voice coil makes the VPPI highly dynamic. The integrated position controller contributes to high stability.
    Read more
  • NEWS
    12 apr. 2023
    Festo - VFEO
    The new manually adjustable throttling valve with check valve VFOE is equipped with the "Push-to-lock" function and optimally suited for standard applications.
    Read more
  • NEWS
    23 jan. 2023
    Festo's broad portfolio and efficient solutions
    Discover the innovative power of Festo's portfolio and itsme's factory scan!
    Read more

Why not take a look at these trainings we offer: