text.skipToContent text.skipToNavigation

Free 18 volt battery-pack of  5.2Ah


When you buy a 18 Volt battery-machine (body or set) of Metabo.
 

How can I request the battery?

Register your order on the special promotion page on the Metabo website.
Upload your invoice fill in your details.

The promotion is valid from May 1 and August 31, 2020.
You can register until September 15, 2020.

Click here for the special page.
ne2020q2-metabo-free_battery_pack_thumb.jpg

​​​​​​​Broad assortment

​​​​Of course, we support your configuration with a broad product assortment. A selection of these products you see below. An overview of Metabo products you will find here. To directly go to an overview of one of the products, please click on one of the links below.

You might also be interested in this:

Metabo Double quick charger
Those who work a lot with cordless machines know the problem: several empty battery packs and only one charger. The ASC 145 Duo from Metabo quickly settles this, because this charger can charge 2 battery packs at the same time. The universal double super fast charger has 2 charging stations next to each other - for parallel charging with only one cable connection
Read further
Dormer Sharkline 2020
Dormer Pramet has expanded their range of Shark Line taps with a new assortment for high strength steels and titanium alloys. Available in spiral point: 'E334' and spiral flute: 'E335' geometries for through and blind hole threading respectively, the new taps provide high performance and process security in hardened and tempered materials below 45 HRC.
Read further
Dormer A095
The A095 is an assortment of different types of drill cassettes with the most commonly used drills from the Dormer range. This set is supplied in a handy plastic drill box, which is shock-resistant. Dimensions according to DIN338RN. This set contains the well-known A002 twist drill. The ideal universal short twist drill for all conceivable machines and materials.
Read further
Flexovit Maxx3
Work smarter not harder with the Flexovit Maxx3 grinding wheels. The innovative design offers remarkable power and refined control from start to finish, powering through metal effortlessly and lasting longer to reduce downtime and costs.
Read further

Check out our other success stories:

  • TESTIMONIAL
    2 apr. 2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more
  • TESTIMONIAL
    19 feb. 2025
    Peeters - Young Company, New Equipment
    Since its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
    Read more
  • TESTIMONIAL
    26 dec. 2024
    Kusters - Putting weight behind it
    Kusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
    Read more
  • TESTIMONIAL
    22 nov. 2024
    Eneco - Green light for green electricity and steam
    Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
    Read more

Take a look at these promotions: