text.skipToContent text.skipToNavigation
 

Danfoss - Optimize your HVAC with 3D Building Information Modeling files 


Save time and reduce risk 

Design your system faster with access to valuable drive information including 3D Building Information Modeling (BIM) files for VLT® HVAC Drive FC 102. You can fully document your installation in AutoCAD Revit, to reduce the risk of errors, and save time on system design. 

The 3D BIM files of building components enable architects and engineers to create highly accurate visualizations of a final solution. In the design stage, these visualizations help to reduce design iterations and minimize risk. They do this by facilitating checks for adequate space for components, wiring, and piping in a building or ship. 


Transparency from cradle to grave 

In the operational phase, the BIM files also facilitate lifecycle optimization, providing documentation of important component information, from factory to end of life. They enable construction companies to provide adequate documentation in the handover from contractor to owner, for lifetime building maintenance purposes. 

For easier access to data in the form of PDF and Excel files, drawing and product data are split into separate documents. These highly accessible formats make it easier to find required data when ensuring compliance with global standards. It also reduces the 3D file size that the AutoCAD system has to manage and provides the opportunity to comply with the different BIM standards globally. 

You can access all the BIM files for FC 102 drives in the 3D models and drawings library. Use the filter for BIM files for quick access. 

You can also search in MagiCAD Cloud for FC 102 BIM files. 


Your advantages: 

  • Easy integration of FC 102 drives into Building Information Modeling (BIM) systems for lifecycle traceability 

  • Design your system faster with access to important drives information including 3D BIM files. Run fewer design iterations. Easier engineering saves you time and reduces the risk of errors. 

  • BIM information is split into detailed product information and 3D drawing with main drive information. This is done to optimize AutoCAD operation time and 3D storage capacity as well as comply with the different BIM standards globally to add required drive information. 

 
 

Stay up to date with the latest news:

  • NEWS
    21 mei 2025
    Have Digitap - Fluke
    Fluke is globally recognized as a leading manufacturer of high-quality test instruments, trusted by professionals across sectors such as electrical engineering, industrial maintenance, and installation technology. Thanks to their reliability, accuracy, and durability, Fluke tools are an essential part of every technician’s toolkit.
    Read more
  • NEWS
    19 mei 2025
    ABB - VMS
    Flexibility and installation speed are the two themes that keep recurring in daily practice. Themes that determine the ease and speed with which projects are implemented and completed. ABB's VMS series of enclosures seamlessly links up with these themes. The cabinets can be supplied as a prefabricated all-in-one solution for switchgear and power distribution systems.
    Read more
  • NEWS
    14 mei 2025
    PIL - UNIQO
    In a world where industrial environments are changing ever faster, the UNIQO series offers a future-proof solution. These modular high-bay luminaires combine efficiency, flexibility and durability in one powerful design. UNIQO has been specially developed for applications such as production halls, warehouses, logistics centres and sports facilities - places where performance counts.
    Read more
  • NEWS
    12 mei 2025
    Rittal - Blue e+ Cooling Units
    Rittal has further developed its Blue e+ cooling units to make them suitable for use at sea. Under the name Blue e+ dynamic, the company is introducing DNV-tested cooling units that meet the strict requirements of the maritime industry. These units have been tested for EMC compatibility, vibration resistance, and their ability to function reliably under various inclinations and dynamic loads.
    Read more

Check out our other success stories:

  • TESTIMONIAL
    2 apr. 2025
    TR Service - Future-proof low-voltage panel
    TR-Service provides industrial maintenance using all disciplines, from electrical and mechanical to hydraulic and pneumatic. With support from Breemes, the company installed a large low-voltage panel. ‘After discussing my summary plan with them, I decided to just do it,’ says director-owner Raoul Tielens. At Breemes' suggestion, the panel was future-proofed by preparing it for power monitoring.
    Read more
  • TESTIMONIAL
    19 feb. 2025
    Peeters - Young Company, New Equipment
    Since its founding a few years ago, Peeters Robotic Solutions has been rapidly developing, working on projects both domestically and internationally and providing standard solutions for industrial palletizing. The company stays up to date with the latest technology, including Festo’s electrical and pneumatic drives. To achieve this, it relies on itsme. “Thanks to their expertise and skills, we can bring innovation to the forefront for our customers.”
    Read more
  • TESTIMONIAL
    26 dec. 2024
    Kusters - Putting weight behind it
    Kusters was looking for a weighing solution for its banknote devaluation machines that was easy to integrate into the Siemens control system. Through itsme, they came into contact with the right knowledge carriers at Siemens. ‘For us as Kusters, itsme is not only a supplier but also a source of knowledge, with which we co-engineer certain components and process steps, such as this weighing system.’
    Read more
  • TESTIMONIAL
    22 nov. 2024
    Eneco - Green light for green electricity and steam
    Eneco Bio Golden Raand, located in the port area of Delfzijl, converts biomass into green electricity and green steam. Each year, the plant processes approximately 300,000 tons of waste wood from the Netherlands and neighboring countries. As part of Eneco’s climate ambitions, a project began in 2022 to replace the existing fluorescent lighting in and around the boiler room. The project was carried out under the supervision of itsme. “Two factors were important in this process: the cost, of course, but also the level of service.”
    Read more

Why not take a look at these trainings we offer: