​​​​​​​Clear communication is half the battle
 

eReM provided complete electrical installation for new shipyard in Kenya

Sometimes a project seems to have been arranged from front to back. But what if you are asked at the very last minute to show what your company is capable of? At eReM in Zwijndrecht, the Netherlands, they know all about it. In part thanks to a rock-solid offer they convinced their end customer – an internationally operating Dutch shipbuilder – to come on board with them. And in this case literally because, as it concerned the installation of the entire electrical system of a new shipyard in Kenya, the components were shipped by sea freight. Their main challenge? In the preliminary phase everything had to be 100% correct. This required thorough preparation in which eReM could count on support from itsme.

Large projects, from panel building to comprehensive solutions in industrial automation, both in the Netherlands and far beyond; at eReM they are accustomed to a lot. Nevertheless, this project posed some unique challenges, beginning with the quotation, says Ton van Lare, project manager at eReM. “Our end customer was looking for a partner for the installation of all the electricity for a new shipyard in Kenya; from the connection of the grid operator to everything that comes with it, like lighting, high-voltage current, hoists and communication.  The process was already at an advanced stage, but the organisation nevertheless asked us to submit an offer. “In this situation, eReM enlisted the help of their permanent technical partner itsme.
​​​​​​​
Mohammed Serroukh, branch manager at itsme, remembers this hectic period very well. “Of course it provided a great opportunity, but on the other hand we only had a few days to put this offer together. By pulling out all the stops we nevertheless succeeded in submitting the offer in time. And it worked, because eReM was awarded the contract.” 
 

Customisation requires constant consultation

​​​​​​​In Zwijndrecht, operations such as panel building, were started immediately. For the materials with Kenya as their immediate final destination Ton, together with colleague and work planner Mehmet Yilmaz, consulted with the end customer. Peter van Vliet, team leader Industry and OEM at itsme, joined them. Together they mapped out all the challenges at an early stage. 
 

Take, for example, the most efficient logistical solution for getting all the materials to Africa. “In addition to all the connectors, lighting, sockets, fuses and cable support systems, you are talking about a considerable amount of cables on reels, really big ones.  Normally, such an order comes to us first, and then we ship it ourselves. But that would have meant engaging other parties to move those reels for us with a forklift”, says Mehmet. Therefore, the sea containers were loaded with the seaworthy-packaged components directly at itsme’s Central Distribution Centre (CDC) and shipped to Kenya from there. 

 “Everyone handled the preparations well, which meant that the implementation itself went smoothly

“A lot of customisation was involved in this order. It is then that communication between all parties involved is of the essence, providing us with so much information; not only to keep everything on the right track, but also because not everything goes according to plan the whole time. Consider, for example, the export aspect. The cable reels are made of black wood. In order to be allowed to import that in Africa, you have to meet all kinds of requirements”, explains Peter. It is precisely this drive to want to know what makes the customer tick that leads to customised solutions, he continues. “Regular consultation in a transparent and open way enables us to share our thoughts with them. That is what we, as itsme, stand for.”

​​​​​​​
Another challenge – a demand by the end customer – was the meticulous labelling of the material. Peter: “It involved a huge number of components. Moreover, lots of cables were of the same type, but of different lengths. Because we had coordinated the labelling and packaging very adequately in advance, the people on location were able to see at a glance what each cable was meant for.” 
 

No room for mistakes 

The greatest challenge of the project was that everything had to be 100% correct in advance, because there was simply no room to repair anything during transportation or afterwards, says Mohammed. “Advance communication really was the project’s strength. The materials are shipped to Kenya by sea freight. It means that you can’t say afterwards ‘We forgot something. We’ll bring it over in a minute.’  We are very active in marine and offshore, including a large number of export projects. This allowed us to act as a solid discussion partner by being able to share our thoughts with eReM.” Ton nods affirmatively. “Everyone handled the preparations well, which meant that the implementation itself went smoothly. It already started at the submission of the quotation; the support given by itsme has helped us tremendously. And as for the orders: we never have to go after anything ourselves.” Mehmet: “In the two months that followed, Peter and I were in almost daily contact. When I ordered products, he would always call afterwards, if only to suggest faster alternatives in case of long delivery times. A few times they even engaged a courier. Everything was delivered on time and for a large part this was due to the fact that itsme was right on top of things.”  

“Especially in the case of customised work, communication between all those involved is essential”

eReM is now awaiting commissioning. The enthusiasm of Ton and Mehmet is not at issue here. “It is absolutely great to see that thousands of miles away our customer has actually built what we designed on paper and that everything fits and makes sense”, says Mehmet. And that also goes for Ton. “It gives me a feeling of real pride. We are not a very big company, but we do acquire big contracts which are very diverse. In this case it was shipbuilding, but some other time it might just as well be petrochemistry again or station automation. That variation is such great fun and also there we find the collaboration with itsme.” 
 

​​​​​​​


​​​​​​​
​​​​​​​Completely at home in automation​​​​​​​

eReM Elektrotechnici BV is based in Zwijndrecht and is an overall partner in automation and control processes. In addition to panel building, they are also experts in E&I engineering, software engineering and E&I installation. With its certified EPLAN engineers and automated panel-building processes, eReM achieves a proven high quality. In addition, as a recognised work placement company with specific professional knowledge, it trains a new generation of techies. With a strategic vision, reliable delivery times and business acumen eReM works for organisations in, among others, petrochemistry, oil & gas, machine building, food industry, offshore and the energy sector. eReM is capable of running the entire automation process.


 

Check out our other success stories:

  • TESTIMONIAL
    19 apr. 2024
    Dymotec - Open Lines in a ‘Perfect Storm’
    COVID-19 and global component scarcity threw the industry into a ‘perfect storm’. Industrial automator Dymotec and Breemes kept the phone lines constantly open to tackle the scarcity problem together with creativity and proactivity. Dymotec in Olen (B) focuses on industrial automation spanning a broad spectrum of industries, from food and pharma to logistics and metal. The company has been around for 30 years and joined the Jeco Energies Group in 2022. Dymotec now has some 50 employees and also has a flexible shell with technicians, programmers and project engineers. Ever since its establishment, the company from Kempen has had a relationship with (the predecessors of) Breemes.
    Read more
  • TESTIMONIAL
    15 feb. 2024
    Enduro - Complete package for heavy-duty work
    Enduro Softslings builds machines for the manufacture of its own heavy lifting soft slings. For a new machine, it called in itsme for the full package: advice on the drives, supply of components and programming of the controls. “We completed the entire project in just over six months. That’s fast for such a specialised machine.”
    Read more
  • TESTIMONIAL
    17 jan. 2024
    Stimac - Good technical support for ever-changing specifications
    If the description for an automation project is clear from the start, it is easy for the industrial automation specialist to give it substance. In practice, however, specifications often change during the course of a project. This happened to Stimac/SNK when designing the control technology for a horticultural machine. For the problems that arose during the process, itsme quickly provided Stimac/SNK with a solution. “When a customer calls us, we respond immediately. So it’s nice to have a supplier like itsme who can also help immediately.”
    Read more
  • TESTIMONIAL
    20 dec. 2023
    Innovatec - Hatching Better Procurement
    Innovatec Hatchery Automation launched a process of professionalisation for its procurement process last year. The company partnered with itsme because of its technical expertise, logistics concepts and intensive contacts with manufacturers. “First we were dating, but now we’re thinking about moving in together.”
    Read more

Stay up to date with the latest news:

  • NEWS
    6 mei 2024
    Festo - Proportional pressure control valve VPPI
    With the VPPI proportional pressure control valve, all nominal sizes are controlled directly; without the need for pilot valves or pre-stages. Due to the pressure compensating element, the valve regulates dynamically and accurately; even at the larger nominal sizes. The powerful and low-friction voice coil makes the VPPI highly dynamic. The integrated position controller contributes to high stability.
    Read more
  • NEWS
    6 mei 2024
    Phoenix Contact - CONTACTRON-speedstarter
    Frequency inverters are often used in applications where, for example, variable speed is used or where the starting and stopping of the motor must be controlled. In use, the CONTACTRON speed starter combines the advantages of a compact motor starter with the essential features of a frequency converter for numerous applications:
    Read more
  • NEWS
    3 mei 2024
    nVent - CADDY spring steel fasteners
    Why installers resolutely choose spring steel fasteners from nVent CADDY? Most of nVent CADDY products can be installed without additional tools. Installers can install most of nVent CADDY spring steel products without additional tools. Too often, having or finding the right tools for the job is no easy task. Helping minimise the number of tools needed on a construction site is how nVent CADDY strives to help customers get the job done as efficiently as possible. In addition, nVent CADDY offers complementary spring steel components that enable complete and strong installations. Translated with DeepL.com (free version)
    Read more

Take a look at these promotions: